Appendix A. CSAT-5060 5 to 25 Watt
IMPORTANT
A.1
Unpacking and Inspection
Inspect the shipping container for damage:
•
•
•
•
•
A.1.1
Man-Power
Comtech EF Data recommends that two technicians be required to install any of the
following installations.
A.1.2
Tools Required
The following tools are recommended for unit installation.
Qty.
1
1
1
Upon completion of installation, refer to Chapter 8
for LNA installation.
Retain shipping container and packing materials for possible re-shipment.
Checked to determine that all parts, materials and documentation has been shipped
with the converter.
Inspect converter for possible damage, and then test for proper operation.
If the shipment is incomplete, or there is mechanical damage, or the converter
does not operate properly:
Notify the Comtech EF Data Customer Service representative immediately.
If there is damage to the shipping container:
Notify the carrier, and retain all shipping materials for inspection by the carrier
Description
Adjustable Wrench
Alternate: Set of various box wrenches
Phillips® - Head Screwdriver
Tin Snips
INSTALLATION
A–1
.
Need help?
Do you have a question about the CSAT-5060 and is the answer not in the manual?
Questions and answers