Appendix B. CSAT-5060 50-Watt
IMPORTANT
B.1

Unpacking and Inspection

Inspect the shipping container for damage:
Retain shipping container and packing materials for possible re-shipment.
Check to determine that all parts, materials and documentation have been shipped
with the converter.
Inspect converter for possible damage, and then test for proper operation.
If the shipment is incomplete, there is mechanical damage, or the converter does not
operate properly, notify the Comtech EF Data Customer Service representative
immediately.
If there is damage to the shipping container, notify the carrier, and retain all shipping
materials for inspection by the carrier.
B.2

Personnel

Comtech EF Data recommends that two technicians perform any of the following
installations.
B.3

Tools Required

The following tools are recommended for unit installation.
Qty.
Description
1
Adjustable wrench
Alternate: Set of various box wrenches
1
Tin Snips
Upon completion of installation, refer to Chapter 8
for LNA installation.
INSTALLATION
B–1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CSAT-5060 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents