How To Put Wires Into The Connector Blocks - Furuno NAVpilot-711C Installation Manual

Autopilot
Hide thumbs Also See for NAVpilot-711C:
Table of Contents

Advertisement

2. WIRING
7. Fasten a cable tie (supplied) to a cable and the "clamp leg".
Braided shield
(If your cable doesn't
have a braided shield,
wind the copper tape
around aluminum foil.)
8. Connect the fan connector.
9. After you have connected all equipment, fasten the cable clamp/fan assy.
2.2.3

How to put wires into the connector blocks

The cables are connected to their connector blocks inside the Processor Unit. Open the
unit and put cables into the connector blocks as shown in the figure below.
CONNECTOR
BLOCK
Push
Twist
cores
.
Note: To connect two Control Units (to TB8 and TB9), change the position of the jumper
block J104 from #1-2 to #3-4. (See the illustration on page 2-2 for location.) For single
Control Unit, use TB8 and set J104 at position #1-2.
2-4
Clamp leg
How to put wire into connector block
1. Remove shield of wire by 6 mm.
2. Twist core.
3. Push spring-loaded catch with slotted-head screwdriver.
4. Insert core into hole.
6 mm
5. Release screwdriver.
6. Pull wire to confirm it is securely inserted.
Wire
Connector block
Drain wire
Vinyl tape
Cable tie
Cable

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Navpilot-711Navpilot-700Navpilot-720

Table of Contents