MAILBOX (G909)
1.1.3 INSTALLATION PROCEDURE
!
CAUTION
Unplug the main machines power cord before starting the following
procedure.
NOTE: 1) When the finisher (A697) is installed on the machine, the bridge unit for
the mailbox (G912) must be installed.
2) The bridge unit for the mailbox must be installed before installing the
Mailbox on the main machine.
1. Unpack the finisher and carefully remove all the shipping tapes.
- A230, A231, A232 B003 and B004 machines -
2. Attach the front joint bracket [A] and rear joint bracket [B] to the main machine
(2 screws each).
3. Attach the upper grounding plate [C] (1 screw).
4. Peel off the backing of the double sided tape that is attached to the lower
grounding plate [D].
5. Attach one lower grounding plate to the center of the bottom edge of the paper
tray unit as shown.
B003/B004/B006/B007
[C]
G909I500.WMF
[B]
[D]
- A230, A231, A232, B003 and B004 machines -
15-12
[A]
G909I509.WMF
SM