SP1
Mode Number
1012*
Exit Junction Solenoid
Start Timing
1*
Exit Entrance Junction
Solenoid
2*
Exit Last Junction
Solenoid
1103*
Fusing Idling
1*
Enable Fusing Idling
2*
Fusing Idling Interval
1104*
Fusing Temperature
Control
1105*
Fusing Temperature
Adjustment
1*
Roller Center: Trays
2*
Roller Ends: Trays
3*
Roller Center: By-pass
4*
Roller Ends: By-pass
Re-load Temp. Minus:
5*
Roller Center
Re-load Temp. Minus:
6*
Roller Ends
SM
SERVICE PROGRAM MODE
Function and [Setting]
Adjust the operation timing of the solenoids at the
entrance and exit of the paper exit section to
accommodate the increased speed of the duplex
unit.
This SP has been added to compensate for the
increased operation speed of the duplex unit for this
machine. Increase the value if the leading edges
are jamming. Decrease the value if trailing edges
are bending at the entrance.
B003 &
[200~450 ms / 370 ms / 10 ms]
B006
B004 &
[200~450 ms / 300 ms (entrance)
B007
370 ms (exit) /10 ms]
Switches fusing idling on/off. When on, the hot roller
will not rotate until enough time has elapsed so the
hot roller can reach optimum temperature. This
ensures even heat on the hot roller.
Switch on if fusing on the 1st and 2nd copies is
incomplete (this may occur if the room is cold.)
0 = Off, 1 = On
In a cold environment, switch on and then set the
idling time with SP1-103-2 to ensure the quality of
the first copies.
[0~60 sec. / 30 sec. / 1 sec.]
You must switch SP1-103-1 on before you can set
the fusing idling interval.
Selects the fusing temperature control mode.
[0 = On/Off / 1 phase
Adjusts the fusing temperature at the center and
both ends of the hot roller for paper fed from a tray.
Use SP1-105-1, SP1-105-2 to adjust for any tray
other than the by-pass tray. Use SP1-105-3, SP1-
105-4 to adjust for by-pass tray.
Allows adjustment of the hot roller temperature at
the center and ends of the roller for the quality or
thickness of the paper. The hot roller in this
machine has two fusing lamps: one heats the
center of the roller, the other heats both ends. Each
fusing lamp can be adjusted separately.
o
o
o
[120
C ~ 200
C / 160
C (B004 & B007: 180
o
1
C step]
o
o
o
[120
C ~ 200
C / 170
C (B004 & B007: 185
o
1
C step]
o
o
o
[120
C ~ 220
C / 175
C (B004 & B007: 190
o
1
C step]
Adjusts the temperature for re-heating the hot roller.
Re-load Temp. = Fusing. Temp – SP Value
o
o
o
o
[0
C ~ 60
C / 30
C / 1
C step]
When the fusing temperature surpasses this
setting, the machine can operate. Do not set up a
re-load temperature (Spec. Temp – SP Value) that
is higher than the SP1-105-2 setting.
5-5
o
C) /
o
C) /
o
C) /
B003/B004/B006/B007