6. Check for continuity across these
terminals. No continuity, replace
transformer. If checking resistance
there should be about 42 ohms
across primary leads.
Secondary Side:
CAUTION - - - - - - - - - - ,
Always disconnect power supply
before making continuity or resist-
ance checks.
1. Check for continuity on secondary
windings. NOTE: The resistance
values of the secondary windings
are small and may not be detectable
unless using a digital meter. These
are approximate values: Y-BK to
Y-BK
2 ohms, W-OR to W-OR
1
ohm and PK to PK
5 ohms.
2. Remove wire connectors Y-BK and
Y-BK from secondary winding.
3. Check for continuity across termi-
nals on this secondary winding. No
continuity, replace transformer.
4. Remove wire connectors W-OR, BU
and W-OR from secondary winding.
5. Check for continuity from BU to both
W-OR terminals. No continuity,
replace transformer.
CAUTION
6. Remove wire connectors PK and PK
from secondary winding.
7. Check for continuity across termi-
nals on this secondary winding. No
continuity, replace transformer.
Voltage checks on the secondary
windings.
CAUTION:
Use extreme care when checking
voltage.
1. Attach meter leads across terminals
Y-BK and Y-BK on secondary
winding. Should see 20.7 VAC, no
voltage replace transformer if
primary and power supply check
okay.
2. Disconnect power supply.
A. Remove wire connectors W-OR,
BU and W-OR from secondary
winding.
B. Attach meter leads across termi-
nals W-OR and W-OR on secondary
winding.
C. Connect power supply. Make
voltage check. Should see 3.8 VAC
across W-OR and W-OR (1.9 VAC
from BU to either of the W-OR termi-
nals), no voltage, replace trans-
former if primary and power supply
check okay.
Always disconnect power supply before making any continuity checks or
resistance readings.
ED/GD401 1090
SECTION 2. ELECTRICAL - MECHANICAL TROUBLESHOOTING
2-13