Maytag 111990" Automatic Dryers Service Manual page 66

1990 automatic dryers
Table of Contents

Advertisement

GAS CHART
GAS TYPE
NATURAL
LPG
BTU PER CU. FT.
1075
2500
PRESSURE INCHES
3.5
11
SPECIFIC GRAVITY
0.65
1.53
DRILL SIZE
42
54
COIL REPLACEMENT
To replace the coils on this valve, unplug the dryer from the wall receptacle. From
the front through the gas valve access door, unplug the wire harness from the gas
valve coils. Notice the holding and booster coils are now molded together and a
three-prong connector is used to conoect them. The secondary coil uses a two-
prong connector. Once the coils have been unplugged, remove the two screws that
secure the coil holding bracket. Remove the bracket and lift the coils off. Replace
coils, bracket and wire harness.
Note: The coil positioning tabs and matching holes in the coil holding bracket for
each coil.
ED/GD401 1090
SECTION 3. SERVICE PROCEDURES
3-38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents