Toshiba PORTEGE S100 Maintenance Manual page 262

Personal computer
Hide thumbs Also See for PORTEGE S100:
Table of Contents

Advertisement

4 Replacement Procedures
Installing the RG board
To install the RG board, follow the steps below and refer to Figure 4-24.
1. Connect the USB cable and RGB cable to the connector CN4632 and CN9510 on
the RG board.
2. Install the RG board to the slot and secure it with the following screw.
• M2×3S
3. Connect the USB cable and RGB cable to the connector CN4610 and CN9500 on
the system board.
4. Install the RGB harness holder and secure it with the following screws.
• M2×4B
4-44
S-FLAT HEAD screw
FLAT HEAD screw
×1
×2
PORTEGE S100 Maintenance Manual (960-508)
4.17 RG board

Advertisement

Table of Contents
loading

Table of Contents