4 Replacement Procedures
Installing the SW board
To install the SW board, follow the steps below and refer to Figure 4-19.
1. Turn up the insulator and connect the SW cable to the connector CN3260 on the
system board.
2. Install the SW board and secure it with the following screws.
• M2×3S
3. Install the switch cover and secure it with the following screw.
• M2×3S
4-36
S-FLAT HEAD screw
S-FLAT HEAD screw
×2
×1
PORTEGE S100 Maintenance Manual (960-508)
4.14 SW board