Items To Be Supplied By The Installer; Locations; Description Of Operation Of Electronic Control Module; Start Up Sequence For Central Heater - BONAIRE Installation Instructions Manual

3 & 4 star ducted gas central heater
Hide thumbs Also See for BONAIRE:
Table of Contents

Advertisement

I
General Information (cont)

Items to be supplied by the Installer:

- Suitable base material for heater.
- Platform/Walkway for roof installation (heat resistant material not required).
- Electric lighting above the central heater and switch to be placed next to
the access opening.
- AGA approved manual shut-off valve (3/4" Natural Gas Heater).
- AGA approved metal flue pipe and required elbows where a flue pipe with
bends is present. AGA approved flue cowl for the flue pipe.
- At the completion of the installation compliance certificates must be
completed for gas & electrical work.

Locations:

1) Do not install the heater in a location where combustible vapours from
flammable or combustible liquids may be present as these can be drawn
into the heater and ignited.
2) Do not install the heater in any location where noise from its operation
may disturb occupants or neighbours. Before installing this product
consider placement of this unit away from areas of the home where
occupants will sleep or relax, such as bedrooms, lounge and dining
rooms. Check local council regulations to ensure compliance.
3) Do not install the heater downstream of an evaporative air conditioner, air
washer or refrigeration coil.

DESCRIPTION OF OPERATION OF ELECTRONIC CONTROL MODULE.

The design of the control module conforms to the Australia Gas Association
AS4622 and AS4625 Standards and is classified as a Class 2Ca device. It
receives instructions via a wired or RF Controller/thermostat.
Electrical rating:
240V, 50 Hz, 10 VA input.

Start up sequence for Central Heater:

1) Turn gas supply on.
2) Turn on power supply to unit.
3) A 2-second self-diagnosis is performed and the fans will run for a few
seconds. If a successful diagnosis is completed the unit will then go to
stand-by mode.
NOTE: Where Navigator RF thermostat is used this must be configured (paired)
with the transceiver before the unit can be operated refer to section 7.
4) To start unit set the thermostat temperature above the room temperature.
5) Combustion air fan will commence operation.
3
Part 5442225 issue E

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3 & 4 star ducted gas central heater

Table of Contents