Chapter 1:Installation And System Overviews; Installation Overview; Planning; Installing - Raymarine SmartPilot X5 Installation & Setup Manual

Tiller & gp tiller
Hide thumbs Also See for SmartPilot X5:
Table of Contents

Advertisement

Chapter 1: Installation and system overviews
This chapter gives an overview of installation procedures and network configurations
for an SPX-5 Tiller system.

1.1 Installation overview

There are two stages to installing an SPX-5 Tiller system, namely planning the
installation, then installing and mounting the components.
It is important to carry out the planning stage, to ensure that all components used in
the system, including cables and accessories, are correctly specified and located.
The following is a summary of the tasks in each stage.

Planning

1. Understand your system.
2. Check equipment supplied.
3. Establish suitable locations for the autopilot equipment.
4. Plan cabling and connections.
5. Produce a schematic diagram.

Installing

1. Mount SPX-5 Course Computer.
2. Install Tiller Drive unit.
3. Install the autopilot controller.
4. Install the compass.
5. Connect power cables and system ground.
6. Connect additional equipment / cables to the Course Computer.
7. Final fix: secure all equipment in place; secure all cables.

1.2 Safe and successful installation

To achieve a safe and reliable installation of your SPX-5 Tiller system, installation
must be carried out by a competent professional who should adhere to the
instructions in this guide.

Certified installation

Raymarine recommends certified installation by a Raymarine approved installer. A
certified installation qualifies for enhanced warranty benefits. Contact your
Raymarine dealer for further details and refer to the separate warranty card packed
with your product.

Getting assistance

If you need further assistance with an installation, contact your dealer or visit the
Raymarine web site www.raymarine.com.
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents