2.11Final checks

When you have completed all necessary installation procedures, but before you
apply power to the system, ensure all equipment and connections are properly
secured.

Secure all cables

To prevent strain on the connector blocks, secure the cables to the Course Computer
with cable ties as shown below.

2.12Commission the system before use

The SPX-5 Tiller system must be commissioned prior to use, in accordance with the
instructions in Chapter 3: Commissioning & setup . For new systems this involves
calibrating the system, which is a safety-critical action.