6
Part Number
D029
D030
D031
D159
D160
1.5 Create a schematic diagram
As part of the preparation for installing your SPX-5 Tiller system, we recommend that
you create a schematic diagram representing the system you want to install. This will
help ensure that you install a safe optimum system, and so is particularly important if
you intend connecting your autopilot to other electronic equipment.
The schematic diagram should include:
Location of all components. See page v and page 7 for EMC guidelines that may
•
affect the location of specific components.
•
Connectors, cable types, routes and lengths.
When you have completed the schematic diagram, you are ready to begin installing
the SPX-5 Tiller system.
SmartPilot X-5 Tiller & GP Tiller Installation & Setup Guide
Description
Pedestal Socket 76 mm (3")
Pedestal Socket 89 mm (3.5")
Cantilever Socket
Tiller Bracket 102 mm (4")
Tiller Bracket 127 mm (5")