Connecting Ac Power And Rps - Enterasys SecureStack C3G124-24P Installation Manual

Poe gigabit ethernet switches
Hide thumbs Also See for SecureStack C3G124-24P:
Table of Contents

Advertisement

Connecting AC and PoE Power
Figure 3-8
1 AC power cord
3.
Observe the power CPU LED (not shown) located on the front panel. During the 
initialization, the CPU LED will start by illuminating solid amber, then start blinking 
green, then blinking amber, then blinking green again until the end of the 
initialization, and then turns solid green. 
If the switch is a standalone unit, it will take approximately 30 seconds for the switch 
to start up. If the switch is a stack Manager, it can take up to 3 minutes or more to start 
up, depending on the number of Member switches in the stack.
3-16 Hardware Installation

Connecting AC Power and RPS

Á
À
2 AC power connector
Note: If the CPU LED illuminates solid red, there was a critical failure. For more
information about the LED indications and troubleshooting, refer to
additional help, contact Enterasys Networks. Refer to
details
.
Â
3 Connector for external redundant power supply
"Getting
Chapter
4. If you need
Help" on page xvi for

Advertisement

Table of Contents
loading

Table of Contents