Site Preparation Checklist
The checklist in Table 40 on page 75 summarizes the tasks you need to perform
when preparing a site for Services Router installation.
Table 40: Site Preparation Checklist
Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Measure the distances between external power
sources and the router installation site.
Select the type of rack.
Plan the rack location, including required space
clearances.
Secure the rack to the floor and the building
structure.
Acquire appropriate cables and connectors.
Chapter 4: Preparing for Router Installation
Performed By
Date
Notes
Site Preparation Checklist
75