Installing And Connecting A Services Router; Before You Begin; Unpacking A J-Series Services Router; Installing J2320 And J2350 Routers - Juniper J-series Services Router J2350 Hardware Manual

J-series services routers software with enhanced services
Hide thumbs Also See for J-series Services Router J2350:
Table of Contents

Advertisement

Chapter 5
Installing and Connecting a Services
Router

Before You Begin

Make the appropriate preparations and verify the J-series equipment before installing
a J-series Services Router and connecting it to a power source and the network.
CAUTION: Do not install a combination of modules in a single chassis that exceeds
the maximum power and heat capacity of the chassis. If J-series power management
is enabled, PIMs and modules (PIMs or PIMs plus a WXC Integrated Services Module)
that exceed the maximum power and heat capacity remain offline when the chassis
is powered on.
This chapter contains the following topics:
Before You Begin on page 77
Unpacking a J-series Services Router on page 78
Installing J2320 and J2350 Routers on page 79
Installing J4350 and J6350 Routers on page 80
Connecting Interface Cables to Services Routers on page 83
Chassis Grounding on page 83
Connecting Power on page 84
Powering a Services Router On and Off on page 89
Before you begin installation, complete the following tasks:
Read the information in "Maintenance and Operational Safety Guidelines and
Warnings" on page 225, with particular attention to "Chassis Lifting
Guidelines" on page 216.
Determine where to install the Services Router, and verify that the rack or
installation site meets the requirements described in "Preparing for Router
Installation" on page 63.
For installation, gather the following equipment and tools:
77
Before You Begin

Advertisement

Table of Contents
loading

This manual is also suitable for:

J-seriesJ2320J4350J6350

Table of Contents