Starting - Standby Operation; Starting Units With A Main Power Switch Labeled Engine/Off/Standby - Carrier VECTOR 6500 Operation & Service Manual

Single-temp trailer and rail refrigeration units with advancet microprocessor
Table of Contents

Advertisement

3.2 STARTING - STANDBY OPERATION

Be aware of HIGH VOLTAGE supplied at the power plug or from the generator. When performing ser-
vice or maintenance procedures: ensure any two way communication is disabled in accordance with
the manufacturer's instruction, ensure the Main Power Switch is in the OFF position and, whenever
practical, disconnect the high voltage source, lockout/tagout the receptacle and disconnect the neg-
ative battery connection. NEVER dis-assemble the generator: HIGH MAGNETIC FIELD INSIDE! This
field can interfere with cardiac implants such as pacemakers and defibrillators.
Ensure the power plug is clean and dry before connecting to any electrical outlet / receptacle.
Do not connect power plug to any electrical outlet without checking that it meets the 460/3/ 60
and 30 Amp electrical requirements of the unit.

Starting units with a Main Power switch labeled ENGINE/OFF/STANDBY.

1. Ensure the switch labeled ENGINE/OFF/
STANDBY is in the OFF position.
3. Place the switch labeled ENGINE/
OFF/STANDBY in the STANDBY po-
sition.
62-11389
-20.0
+34.5 F
ENGINE
STANDBY
WARNING
WARNING
WARNING
2. Ensure the external power circuit breaker is off,
connect standby cable to unit and then turn the ex-
ternal power circuit breaker on.
4. The unit will then perform a Self Test (refer to section
3.3) and start the unit automatically.
3−2
ENGINE
OFF
STANDBY

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents