STARTING UNIT - STANDBY OPERATION

Make sure the power plug is clean and dry before con-
necting to any power source.
Do not attempt to connect or remove power plug or per-
form service and/or maintenance before ensuring the
unit RUN/STOP Switch is in the STOP position, the I/O
switch is in the "O" position and the external power cir-
cuit breaker is OFF.
STANDBY GUIDELINES
For safe, reliable operation in standby mode, it is important to consider
the following guidelines:
NEVER connect the unit to a power source with the RUN/STOP
switch in the "RUN" position.
The power supply cable and circuit breaker must comply with the
following:
Operating
Voltage
230 V 60 Hz 3
phase
When multiple units are in use, each unit must be operated on its
own electrical circuit. You should never operate more than one unit
on a circuit breaker.
When preparing a circuit for operation of the refrigeration unit, a
licensed electrician should be contracted. A licensed electrician is
familiar with all local ordinances and special requirements for your
area and can ensure that the circuits are properly designed and
installed, and that connections are correct.
If unit is switched to Standby and the power plug is not
plugged in, "NO POWER" is displayed.
WARNING
!
WARNING
!
FLA
Rating
35 A
TIP
7
Circuit
Breaker
Requirement
Capacity
50 A
8/3 with ground
(up to 50 ft)
Cable
62-11491