Appliance Preparation

A. Vent Collar Preparation
CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during instal-
lation. Sheet metal edges are sharp.
NOTICE: This appliance is top vented ONLY.
1. Remove shrink wrap from appliance. Figure 6.1 shows
the shipping location of the seal cap and heat shields
(Section 6), splatter guard and fi nishing templates
(Section 10), and the logs and Teco-Sil (Section 11).
2. Remove seal cap from top of appliance by removing
one screw, which is included, to prevent construction
material from getting into appliance. Remove seal cap
when pipe installation phase begins. See Figure 6.2.
3. Ensure gasket seal is in place prior to installing vent
pipe sections. Gasket is installed at the factory.
SPLATTER GUARD
SPLATTER GUARD
HEAT SHIELDS
HEAT SHIELDS
Figure 6.1 Shipping Location of Components
Heat & Glo • TRUE-36, TRUE-42, TRUE-50 Installation Manual • 2282-980 Rev. F • 8/14
LOGS
LOGS
SEAL CAP
SEAL CAP
SEAL CAP
SEAL CAP
Figure 6.2 Seal Cap and Gasket Location
FINISHING
FINISHING
TEMPLATES
TEMPLATES
GASKET
GASKET
TECO-SIL
TECO-SIL