B. Wiring Requirements
Intellifi re Plus Ignition™ System Wiring
• Wire the appliance junction box to 110-120 VAC for
proper operation of the appliance.
WARNING! Risk of Shock or Explosion! DO NOT wire
IPI controlled appliance junction box to a switched circuit.
Incorrect wiring will override IPI safety lockout.
• Refer to Figure 8.3, IPI Wiring Diagram.
• This appliance is equipped with an IntelliFire Plus™
control valve which operates on a 6 volt/1.5 AMP system.
• Plug the 6 volt transformer plug into the appliance junction
box to supply power to the unit OR install 4 AA cell
batteries (not included) into the battery pack before use.
NOTICE: Batteries should only be used as a power source
in the event of an emergency power outage. Batteries
should not be used as a primary long-term power source.
Battery polarity must be correct when installing batteries.
When using batteries as a power source, the 6-volt
transformer must be unplugged from the receptacle.
Do not store batteries in the battery pack when the
appliance is powered by the 6 volt transformer connected
to permanent electrical service.
TO JUNCTION
BOX (110V)
Figure 8.3 IPI Wiring Diagram
38
Heat & Glo • TRUE-36, TRUE-42, TRUE-50 Installation Manual • 2282-980 Rev. F • 8/14
FLAME
SENSE
MODULE
I
S
FLAME
MODULATION
FRONT EMBER LIGHTING (X 3)
IGNITER
AUX300 MODULE
BATTERY PACK
6V DC
LED CONTROL
BLACK/RED
REAR ACCENT LIGHTING (X 2)
RC300 4.5V DC
(AAA X 3)
AUX2 NOT USED
PROTECTIVE COVER INCLUDED
TO JUNCTION
BOX 110VAC
BLACK/RED