enphase Envoy Installation And Operation Manual page 43

Envoy communications gateway
Table of Contents

Advertisement

14. Click Apply Grid Profile.
This propagates the settings to the microinverters.
The Apply Profile screen appears. This screen shows the Grid Profile Status for each
microinverter. Initially the status for each unit is shown as un-set, soon followed by a status
of "propagating." After approximately 10 minutes, the status is "set."
This screen also allows you to generate a report to confirm that the microinverters have been
set with an updated grid profile.
15. Click View Device Profile Report.
The Device Profile Report screen appears.
16. Enter the site information in the window provided.
17. Use your browser to send this report to your printer or to save it to a file. After printing or
saving the file, you can send it to the local regulatory agency to verify the trip point settings.
43
Site Name
123 Avenue
Town, State/Province
Country
 2014 Enphase Energy Inc.
Envoy Installation and Operation
Click to View
Grid Profile
Report
Enter site
information
here.
141-00014 Rev 04

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents