8.03 Installing Front Panel
1. PCB3
Place PCB1 into front panel.
2. WELD CURRENT potentiometer
Turn potentiometer shaft fully clockwise.
3. Arc Force/ Down Slope control potentiometer
Turn potentiometer shaft fully clockwise.
4. Potentiometer mounting nut.
Install nut and tighten.
5. WELD CURRENT knob
Install knob onto potentiometer shaft. Align the knob pointer to line up with maximum current calibration mark
on the panel, then tighten the set screw.
6. Arc Force/ Down Slope Control knob
Install knob onto potentiometer shaft, align the knob pointer to line up with maximum mark on the panel, then
tighten the set screw.
7. PROCESS selector switch boot.
Install boot over the switch and tighten nut onto switch.
8. Trigger Selector Switch boot
Install boot over the switch and tighten nut onto switch.