ASSEMBLY PROCEDURE
THERMAL ARC 161STL, 201TS
SECTION 8:
ASSEMBLY PROCEDURES
8.01 Installing Base Board
1. Base Panel
2. Panel screws
Secure the Main Power PCB1 to the Base Panel with the Panel Screws.
3. Main power PCB1 assembly
2
1
3
Art # A- 10181
Manual 0-5148
8-1
Assembly Procedures