Test Chart (Proof Of Operation) - Siemens BTC-BR User Manual

Tachograph programmer and calibrator
Table of Contents

Advertisement

BTC-BR User's Manual
2.4.8.2 – Test Chart (Proof of operation)
Steps
Contents of the display
1
4. CHECK K MEASUR
5. DEVICE TESTING
6. PROGRAMMING
5
6
(
/
) – Scroll
1. TESTE DE DIST.
2
2. TEST CHART
3. VARIABLE SPEED
5
6
(
) – Scroll
/
TEST CHART
3
MTCO
KTCO
5
6
(
/
) - Scroll
TEST CHART
4
K = [08000] P/Km
(E) – Start
TEST CHART
5
MEAS RANGE =[125] Km/h
5
6
(
/
) - Scroll
TEST CHART
6
S= 000
MR=125km/h
(C) – Exit
TEST CHART
7
S= 000
∗ ∗ ∗
END OF TEST
(C) – Exit
Keys
E
(E) Enter
E
(E) Enter
E
(E) Enter
(C) Exit
E
(E) Cont.
E
t= 075
P= 01
K=08000
t= 001
P= 22
∗ ∗ ∗
C
Procedures
Select Device Testing
This function will access a sub-menu in which
will be possible to measure the indication of
the odometer, to generate a test chart and
inject a signal of speed previously known.
Select Test Chart
In this function will be possible to generate
a disk of proof of good operation of
tachograph or if there is an anomaly in the
recording.
Select MTCO or KTCO
This function prepares the Calibrator to
generate a signal of speed compatible
with the selected tachograph.
Enter the value of constant "K" readed in
the previous step. (Check "K" Measuring).
Enter the value corresponding to the larger
scale
of
the
speed
speedometer/tachograph. The most usual is
125 km/h. See Table 01.
The automatic test starts in the step 01. They are
22 steps with duration and speed variables (see
Table 01). The total time of the test is 1h50', and
may be interrupted at any time.
At the end of the test will be issued
information
on
the
screen
programmer and the red led will be lit until
pressed the C button.
in
the
display
of
of
the
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vdo btc-br

Table of Contents