Facing And Finishing Requirements; Unit Assembly Prior To Installation; Top Standoff Assembly; Flueing Introduction - Masport PG121-NG Owners & Installation Manual

Zero clearance room sealed gas fireplace
Table of Contents

Advertisement

This fireplace is supplied with a 3" metal extension trim above the fireplace. The extension trim may be replaced if the framing is faced with a non-
combustible material placed flush with the front and side face of the unit and extending from the top of the unit. (ie. tile, slate, etc.)
The 4 Top Standoffs must be correctly positioned and attached to the top before unit is slipped
into position.
The top standoffs are shipped in a flat position and must be folded into shape and attached.
1) Remove the standoffs from the fireplace
top.
2) Take each standoff and bend into the
correct shape. Bend up at the bend lines
until the screw holes in the standoff and the
pre-punched screw holes on the fireplace
top line up.
3) Attach the standoff securely to the top with
4 screws per standoff (on opposite cor-
ners).
Masport PG121/PG131 Zero Clearance Room Sealed Gas Fireplace
FACING & FINISHING REQUIREMENTS
UNIT ASSEMBLY
PRIOR TO
INSTALLATION

Top Standoff Assembly

INSTALLATION
FLUEING
INTRODUCTION
The PG121/PG121LC/PG121RC/PG131 uses
the
"balanced
flue"
technology Co Axial
system. The inner liner flue products of com-
bustion to the outside while the outer liner
draws outside combustion air into the combus-
tion chamber thereby eliminating the need to use
heated room air for combustion and losing
warm room air up the chimney.
Note:
These flue pipes must not be con-
nected to any other appliance.
The gas appliance and flue system must be
flueed directly to the outside of the building, and
never be attached to a chimney serving a
separate solid fuel or gas burning appliance.
Each direct flue gas appliance must use it's own
separate flue system. Common flue systems
are prohibited.
11

Advertisement

Table of Contents
loading

Table of Contents