CadJet 3D Service Manual
Remove the Y-Arm Assembly, Pinch Rollers, Slide
Shaft, and Auto-Load Sensor
1. Perform steps 1 through 13 of the Remove the Left, Top, and Right
Covers procedures to remove the Left, Top and Right Covers.
2. Perform steps 2 through 6 of the Remove the Ink Delivery System
procedures to remove the Ink Delivery System.
3. Perform the Remove the Carriage Assembly, Carriage Belt, and the
Frame Tensioner procedures to remove the Carriage Assembly from
the Slide Shaft.
4. Perform steps 3 and 4 of the Remove the Trailing Cable Assembly
procedures to remove the Trailing Cable Assembly.
5. Perform steps 5 and 6 of the Remove the Stabilizer Bracket and
Encoder Strip procedures to remove the Stabilizer Bracket
Assembly.
6. Disconnect the Load Sensor connector at the J4 location on the
MPCB. Grasp the Load Sensor connector with the thumb and
forefinger and pull straight out.
7. Remove the seven screws that secures the Y-Arm Assembly to the
Platen. See Figure 5-22.
5-40
Assembly\Disassembly