Gas Line Installation - Travis Industries 430 GSR2 Owner's Manual

With screen
Table of Contents

Advertisement

Installation (for qualified installers only)

Gas Line Installation

1. Route the included flex tube through the hole in the left side of the insert and out the front as shown below.
2. Bend the flex tube up.
3. Attach the included gas shutoff valve to the end of the flex tube and gas inlet as shown below.
Position so the valve handle is on the right as shown.
Leak-test all gas line connections.
© Travis Industries
4140811
13
100-01340

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents