Wiring Information - Furuno BR-500 Operator's Manual

Bridge navigational watch alarm system (bnwas)
Hide thumbs Also See for BR-500:
Table of Contents

Advertisement

How to fabricate and fix cables to the Processor Unit
80 mm
Wrap wires with
vinyl tape.
How to fabricate cables for processor unit
How to attach EMI core to power cable
Attach supplied EMI core to the power cable.
4.7.2

Wiring information

Item
Operator fitness
Cable 26S0001
(between BR-510 and
BR-520)
80 mm
Wrap armor with
vinyl tape.
EMI core
• FAR-2105 : It is not possible to create a connection for operator fit-
ness between FAR-2105 and the Processor Unit, because the FAR-
2105 does not have operator fitness output.
• FAR-2107 : Use port J612 (pin #7/8 for operator fitness), where a con-
tact signal is available.
• Other makes of radars : Check for availability of contact signal.
This cable is fit with a Micro-C connector (male) on one end and a
stripped end for connection to the BR-520. The standard length is 6 m.
10 m, 20 m, 30 m, 40 m, and 50 m cables are optionally available.
Fix cables to post with cable tie
Cable tie
Description
4. INSTALLATION
4-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents