How to fabricate cables at external equipment side

Power cables for Processsor Unit (DPYC-1.5 (AC power), DPYC-2.5 (DC power))
L
Sheath
6
Crimp-on lug
Inner diameter φ4
Outer diameter φ7
MPYC-2 (Operator Fitness), MPYC-4
MPYC-7
*2
(Cabin Panel, Timer Reset Panel)
L
Sheath
6
Connect cores to
WAGO terminal
block.
TTYCS-1 (VDR)
L=Distance from cable clamp
to terminal connection
L
Shield
6
Connect cores to
WAGO terminal
block.
4-14
L=Distance from cable clamp
Armor
Cut the sheath.
15 10
Vinyl tape
Set this part in
cable clamp.
(Motion Detector, Flash Beacon)
*1
L=Distance from cable clamp
to terminal connection
3
Armor
Cut sheath.
10 10
Set this part in
Vinyl tape
cable clamp.
Remove paint.
50
Cut vinyl sheath.
Pull out cables from shield;
solder vinyl wire to shield.
Set this part in cable clamp.
Vinyl tape
to terminal connection
DPYC-1.5: φ =
DPYC-2.5: φ =
Conductor
DPYC-1.5:
S = 1.5 mm
φ = 1.56 mm
DPYC-2.5:
S = 2.5 mm
φ = 2.01 mm
MPYC-2
φ =
10.0 mm
TTYCS-1
φ = 10.1 mm
Conductor
S = 0.75 mm
φ = 1.11 mm
11.7 mm
12.8 mm
Armor
Sheath
2
2
Also available for
*1
Cabin Panel connection.
Armor
Insulator
Sheath
Conductor
S = 1 mm
2
φ = 1.29 mm
MPYC-4
φ = 11.2
mm
MPYC-7
φ = 13.2
mm
Use MPYCY-7 for
*2
Watertight Cabin
Panel.
Armor
Sheath
Shield
2