Main Alarm Panel - Furuno BR-500 Operator's Manual

Bridge navigational watch alarm system (bnwas)
Hide thumbs Also See for BR-500:
Table of Contents

Advertisement

4. INSTALLATION
Item
Cable MPYC-7
(between BR-530/550
and BR-520)
Motion Detector
BR-560
4.7.3

Main Alarm Panel

Connect the Processor Unit to the CAN bus connector with the drop cable FI-50-
DROP (supplied). Run a ground wire (IV-2sq) between the ground terminal and ship's
ground.
Ground Wire
(IV-2sq)
4-12
40 m and the total length for all units is max. 150 m. For example, when
four BR-530 are installed:
No.1 BR-530: 40 m
No. 2 BR-530: 40 m
No. 3 BR-530: 40 m
No. 4 BR-530: 30 m
Total length: 150 m
• Pyroelectric detection
• Detection range: Up to 5m, 80°×80°
• Detection rate: 0.8 thru 1.2 m/s
• Detection sensitivity: 4°C (difference from surround in temperature)
Generally, up to two Motion Detectors can be installed, at port
"INPUT3-8". In this case, operation fitness can be connected via port
"INPUT2" by switching over on the Configuration Menu.
No use
CAN bus connector
Use drop cable FI-50-DROP
10 m (Max. 50 m)
Description
NMEA 0183 connector
(for service)
Processor Unit
BR-520

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents