Uncrating, Positioning And Leveling; Uncrating/Positioning/Leveling - Meiko K-200 Owner's Installation, Operation And Maintenance Manual

K-tronic series high temperature sanitizing rack conveyor dishwashers (usa version)
Hide thumbs Also See for K-200:
Table of Contents

Advertisement

S
3 - I
ECTION
NSTALLATION

3.3 Uncrating, Positioning and Leveling

IMPORTANT
Most K-Tronic series machines are shipped
in a single section, with wiring and plumbing
connections already in place from the factory.
The Installation section of this manual
describes the installation of these pre-
assembled machines.
Due to space limitations at some installation
sites, it may be necessary for the machine to
be shipped in sections. If this is the case,
assembling the sections is outside the scope
of this Manual. Follow the on-site directions
of the Meiko factory representative to
assemble the sections.
1. Remove all shipping and packaging ma-
terial from the appliance, including sup-
ports and wrappings. Leave the shipping
skid in place at this time to allow for easier
movement to the installation location.
2. Check for shipping damage as described
in Section 2, "Transport and Shipping." If
damage is present, call Meiko Customer
Service at 1-800-868-3840, providing full
details on the customer, serial number and
extent of damage present. Meiko will file
a freight claim based on this information.
3. Move the appliance to the installation area
using proper moving equipment.
CAUTION
When moving the machine, ALWAYS sup-
port it from both ends - not the center.
Figure 3-1: Shipping skids
Pallet
cross-member
Page 6
CAUTION
Be sure that the moving equipment is
positioned underneath the SKID and not
the MACHINE. Some components of the
machine extend down from the frame and
can be damaged if the machine is
improperly lifted. See Figure 3-1.
CAUTION
If the pallet is removed, the frame of the
dishwasher can be damaged by improper
lifting. The machine's weight must always
be distributed properly using cross-mem-
bers to protect the frame.
4. After the machine is moved to the correct
location, lower the jacks to the floor, but
leave them in place.
5. Remove the hardware attaching the raised
cross-members of the pallet to the large
runners that rest on the floor. To remove
the hardware, you will need the following
tools:
6. With the hardware removed, slowly raise
the jacks. The cross-members will lift free,
while the large runners remain on the floor.
7. Remove the runners and lower the jacks.
Then, remove the cross-members.
8. The machine can be moved for a SHORT
distance by carefully sliding it on the floor.
CAUTION
Be careful not to damage the legs on tile
gaps, gratings, or other irregularities in the
floor.
9. Machines that are not equipped with a
blower dryer include a cowling at the exit
end of the machine. If dish tables are al-
ready in place, it may be necessary to tem-
Pallet jacks MUST
support the cross-
porarily remove the cowling to install the
members of the
machine. See Figure 3-2.
pallet, NOT the
bottom of the
The cowling is held in place by 8mm hex
machine!
head acorn nuts on the inside of the ma-
Pallet
chine. For easy access to the acorn nuts,
longitudinal
simply lift the front access door(s).
runner
Torx TX 20 screwdriver
Torx TX 25 screwdriver
Wrench with 10mm hex socket
#3 Phillips-head screwdriver

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-200 lpwK-400 pwK-200 pwK-400K-400 lpw

Table of Contents