Powering Up And Configuring The Server - HP Proliant ML350p Gen8 User Manual

Hide thumbs Also See for Proliant ML350p Gen8:
Table of Contents

Advertisement

Install and lock the rack bezel
21.
Install the fan cage.
22.
Install the air baffle (on page 24).
23.
Install the access panel (on page 22).
24.
Install the server on the rack rail, and then slide the assembly into the rack.
25.
NOTE: For detailed instructions on installing the server into the rack, see the Quick Deploy
Rail System Installation Instructions included with the kit.

Powering up and configuring the server

To power up the server:
Connect each power cord to the server.
1.
Connect each power cord to the power source.
2.
Press the Power On/Standby button.
3.
("Install the rack
bezel" on page 21).
Setup 39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents