Full Reline With Outside Air-Vertical - Quadra-Fire CASTILEI-MBK Owner's Manual Installation And Operation

Quadra-fire castile pellet insert
Hide thumbs Also See for CASTILEI-MBK:
Table of Contents

Advertisement

Castile Pellet Insert
C. Full Reline With Vertical Outside Air
NOTE: Check clearances carefully for this type of
installation to ensure adequate room for outside air
venting.
12" (305mm)
min. above
NOTE; Use metal
plate around
exhaust vent pipe
and seal all edges
with non-flammable
insulation such as
mineral wool or
ceramic.
Do not use high
temperature caulk-
ing materials to seal
any edge to prevent
future serviceability
Figure 16.1
Page 16
12" (305mm)
min. below
Outside Air
Termination
at
Chimney Top
7022-122D
CAUTION
Check building codes prior to installation.
• Installation MUST comply with local, regional, state and
national codes and regulations.
• Consult local building, fi re offi cials or authorities having
jurisdiction about restrictions, installation inspection,
and permits.
NOTE: In Canada, only a full reline is allowed per
ULC S628-93, ORD ULC C1482-M1990.
NOTE: In Canada this fi replace insert must be installed
with a continous chimney liner of 6 inch (152mm) in
diameter extending from the fi replace insert to the top
of the chimney. The chimney liner must conform to the
Class 3 requirments of CAN/ULC-S635, Standard for
Lining Systems for Existing Masonry or Factory-Built
Chimneys and Vents, or CAN/ULC-S640, Standard for
Lining Systems for New Masonry Chimneys.
May 12, 2014

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Castilei-pmhCastilei-csbCastilei-cwl

Table of Contents