CASTILE INSERT
B. Full Reline With Outside Air - Vertical
NOTE: Check clearances carefully for this type of instal-
lation to ensure adequate room for outside air venting.
CAUTION
Check building codes prior to installation.
• Installation MUST comply with local, regional, state and
national codes and regulations.
• Consult local building, fi re offi cials or authorities having juris-
diction about restrictions, installation inspection, and permits.
12" (305mm)
min. above
NOTE; Use metal
plate around
exhaust vent pipe
and seal all edges
with non-flammable
insulation such as
mineral wool or
ceramic.
Do not use high
temperature caulk-
ing materials to seal
any edge to prevent
future serviceability
Figure 18.1
18
12" (305mm)
min. below
Outside Air
Termination
at
Chimney Top
NOTE: In Canada, only a full reline is allowed per ULC
S628-93, ORD ULC C1482-M1990.
NOTE: In Canada this fi replace insert must be installed
with a continuous chimney liner extending from the fi re-
place insert to the top of the chimney. The chimney liner
must conform to the Class 3 requirements of CAN/ULC-
S635, Standard for Lining Systems for Existing Masonry
or Factory-Built Chimneys and Vents, or CAN/ULC-S640,
Standard for Lining Systems for New Masonry Chimneys.