Section 6: Mobile Home - Quadra-Fire CASTILEI-MBK Owner's Manual Installation And Operation

Quadra-fire castile pellet insert
Hide thumbs Also See for CASTILEI-MBK:
Table of Contents

Advertisement

6
Mobile Home
A. Mobile Home Installation
You must use a Quadra-Fire Outside Air Kit for instal-
lation in a mobile home.
1.
An outside air inlet must be provided for the combustion
air and must remain clear of leaves, debris, ice and/or
snow. It must be unrestricted while the appliance is
in use to prevent room air starvation which causes
smoke spillage. Smoke spillage can also set off smoke
alarms.
2.
The combustion air duct system must be made of
metal. It must permit zero clearance to combustible
construction and prevent material from dropping into
the inlet or into the area beneath the dwelling and
contain a rodent screen.
3.
The appliance must be secured to the mobile home
structure by bolting it to the fl oor (using lag bolts). Use
the same holes that secured the appliance to the ship-
ping pallet with a minimum of two attachment points.
4.
The appliance must be grounded with #8 solid copper
grounding wire or equivalent, terminated at each end
with an NEC approved grounding/bonding connector.
5.
Refer to clearances to combustibles and fl oor protection
requirements on pages 9 to 11 for listings to combus-
tibles and appropriate chimney systems.
6.
Use silicone to create an effective vapor barrier at
the location where the chimney or other component
penetrates to the the exterior of the structure.
7.
Follow the chimney manufacturer's instructions when
installing the vent system for use in a mobile home.
8.
Installation shall be in accordance with the Manufactur-
ers Home & Safety Standard (HUD) CFR 3280, Part
24.
WARNING
Installation must comply with Manufactured Home and
Safety Standard (HUD), CFR 3280, Part 24.
WARNING
Asphyxiation Risk.
DO NOT INSTALL IN A SLEEPING ROOM.
Consumes oxygen in the room.
May 12, 2014
THE STRUCTURAL INTEGRITY OF THE MANUFAC-
TURED HOME FLOOR, WALL AND CEILING/ROOF MUST
BE MAINTAINED.
Do NOT cut through:
• Floor joist, wall, studs or ceiling trusses.
• Any supporting material that would affect the structural
integrity.
Storm Collar
Joist Shield/Firestop
Figure 16.1
7022-122D
Castile Pellet Insert
CAUTION
Spark Arrestor Cap
Roof Flashing
Approved Class "L" o
"PL" Pellet Vent
Page 17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Castilei-pmhCastilei-csbCastilei-cwl

Table of Contents