Protection For The Personnel; Mains Connection (General); Checklist For Connectors - AEG PROTECT C. 10000 Operating Instructions Manual

Table of Contents

Advertisement

5.1

Protection for the personnel

Before setting up the UPS appliance and the external battery
modules (optional accessory) check the following:
♦ Disconnect the unit from the mains.
♦ Protect against reconnection.
♦ Assure for no power.
♦ Ground an short circuit system.
♦ Cover or seals adjacent components still under power.
5.2

Mains connection (general)

To guarantee the correct operation of the UPS and the
optional accessories it is necessary to supply the mains line
with the respective protection.
5.2.1

Checklist for connectors

The connection and grounding terminals are the same for all
the PROTECT C. The cables are connected as follows:
♦ Remove the cover of the terminals.
♦ Introduce the cables from underneath resp. the rear
♦ Connect the protective conductor terminal (PE) at the
♦ Connect the single lines on the respective terminals.
♦ Fix the cable for strain relief to the cable connection
♦ Check cable for perfect fit, if necessary fasten screw
♦ Remove cable pieces, tools, screws etc. from the
♦ Fix cover of the terminals again.
into the terminals area of the PROTECT C.
marked position.
bus-bar.
again.
terminal panel.
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Protect c. 6000Protect c. 6000 sProtect c. 10000 s

Table of Contents