Executing A Test Switch - AMX Optima Instruction Manual

Distribution matrix
Hide thumbs Also See for Optima:
Table of Contents

Advertisement

Installation and Setup

Executing a Test Switch

Execute a test switch to verify the system is working properly before attaching all inputs and outputs.
Aside from having signal cables (and a controller if applicable) attached, the system is ready to execute
switches when it ships from the factory.
The first two source and destination devices must be attached to the input and output connectors as
indicated in the "AutoPatch Connector Guide" that is shipped with each system (for specific board
connector information and specifications, see the applicable board chapter in this manual). After the
devices are connected, power must be applied to the enclosure and then to the devices before executing
a test switch.
Note: If the signal from the source or destination device is a component signal that requires being
attached to multiple input or output connectors (e.g., an RGsB signal that requires three
connectors), all of the signal cables for that signal must be attached before executing the test switch.
A test switch can be executed from the following:
Before executing the test switch, make sure the first two source devices and the first two destination
devices are connected to the input and output connectors exactly as shown on the "AutoPatch Connector
Guide" that is shipped with each system. Depending on the signal type (e.g., component signals), you
may need to attach multiple input and output cables.
Note: Since each board in an Optima has its own switching matrix, signals can only be routed from
inputs on one board to outputs on the same board.
When executing a test switch, we suggest routing Input (source) 1 to Output (destination) 2 on the
virtual matrix or level indicated on the "AutoPatch Connector Guide."
HDMI I/O Board – Executing a Test Switch
For HDMI boards, the system stores sink information when a switch is executed and retains that
information even after the switch is disconnected. Therefore, we recommend becoming familiar with
how HDMI switching works in an Optima by reading the "HDMI I/O Board" chapter (see page 69)
before executing a test switch. Then execute the test switch to verify the system is working correctly,
disconnect the test switch, and clear the sink key cache (see page 83) before finishing the installation.
Control Panel
Directions for executing switches using the control panel specific to your system can be found in the
applicable Instruction Manual for that control panel on the AMX AutoPatch CD or at www.amx.com.
Depending on the control panel, the term virtual matrix or level may appear on the LCD screen. When
controlling an Optima, these terms are interchangeable.
AMX Control Device
For executing and disconnecting switches using an AMX control device, see the specific control device
documentation.
APControl 3.0 or APWeb
Directions for executing and disconnecting switches using APControl 3.0 are found in its Help file.
For directions for executing switches using APWeb, see the Instruction Manual – APWeb Interface.
36
Front or remote control panel
AMX control device
AMX control software, such as APControl 3.0 or APWeb
BCS (Basic Control Structure) commands over an external controller
External third-party controller
Optima Instruction Manual

Advertisement

Table of Contents
loading

Table of Contents