Securing the Base
Use the four pretapped holes to secure the touchcomputer from below the
mounting surface. The holes are designed to work with ISO metric M4 screws.
Mounting screws are not included with the product but should be readily available
at any hardware store. Refer to the figure below for the location of the holes. All
dimensions are in millimeters.
Mounting Diagram
1)
C-S
T
U
G
4
ERIES
OUCHCOMPUTER
SER
UIDE
Need help?
Do you have a question about the C-series and is the answer not in the manual?