Preventative Maintenance - Gree E-TAC Installation And Operation Instructions Manual

Packaged terminal air conditioner/heat pump 7000-15000 btuh
Hide thumbs Also See for E-TAC:
Table of Contents

Advertisement

PREVENTATIVE
MAINTENANCE
Preventative
maintenance
is essential
to proper
unit operation,
efficiency
and longevity.
To ensure equipment
operates
properly,
it must be properly
maintained.
Equipment
operation
should be checked
and verified
several
times
during
each year. During
regular
unit inspection
and maintenance,
follow
the
guidelines
below:
o
Clean both sides of outdoor coil with warm
water and a mild detergent. Do not use corrosive
coil cleaners.
(Never use high pressure
spray on coils.)
o
Clean basepan
and outdoor vent filter.
o
Clean outdoor orifice and fan.
o
Clean indoor coil.
(Never use high pressure
spray on coils.)
o
Clean indoor fan, wire screen and front panel.
o
Clean or install new indoor-air
inlet filter(s).
o
Clean wall sleeve and outdoor grille.
o
Inspect cord and receptacle.
o
Secure electrical
connections.
o
Ensure front panel is properly
mounted
and not damaged.
o
Ensure wall sleeve is installed
properly.
o
Ensure heat and cool cycles operate
properly.
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Etac seriesGb series

Table of Contents