Copy Schedule Screen - GE CC-SCSTAT Installation Manual

General electric thermostat user manual
Table of Contents

Advertisement

Copy schedule screen

The Copy schedule screen (Figure 7) is a sub screen of the
Copy schedule screen allows you to copy a day's schedule to another day or group of days.
To copy a day's schedule, do the following:
1. Select the day to be copied in the Heat and cool schedule screen. Scroll to the C at the bottom of the
Heat and cool schedule screen to highlighted it. The Next button will change to the Copy button. Press
Copy to open the Copy schedule screen (see
2. Scroll through the days in the Copy schedule screen and select the days the schedule is to be copied to
by setting the N under each day to Y, using the Up (Yes) and Down (No) buttons.
3. After selecting all the days desired, press Copy.
4. Press Back to exit the Copy schedule screen.
Figure 7. Copy schedule screen
Screen navigation buttons include:
Back. Return to the
Left. Move the selection bar back.
Right. Move the selection bar forward.
Copy. Copy the schedule to the selected days.
Up (Yes). Copy the schedule to this day.
Down (No). Do not copy to this day.
Copy Monday Schedule
Sun Tue Wed Thu Fri Sat
N
Y
Back
Back
Left
Heat and cool schedule screen
Heat and cool schedule screen
Heat and cool schedule screen
to
Yes
Y
Y
Y
N
No
Copy
Right
Copy
on page 10.
on page 10. The
on page 10).
Up (Yes)
Down (No)
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartcommand cc-scstat

Table of Contents