Appendix E; Power Supply Positioning And Cleaning - Honeywell TMS 9250 User Manual

Torque measurement system
Table of Contents

Advertisement

6. Appendices
008-0738-00
6.5

APPENDIX E

Power Supply Positioning and Cleaning

This supplement provides information on positioning information on positioning the power
supply and cleaning instructions.
Step
Positioning
the Power
Supply
Cleaning the system
Step
Step1:
Disconnect
Power
Step2: Clean
Components
Product Grounding
Step
Product
Grounding
50
© 2012 – Honeywell International Inc. All rights reserved
Place the power supply of the system in a place where you can
easily unplug the power cords.
Disconnect the power supply from the system. Wait for rotating parts
to come to stand still
Clean the Power supply adapter, SPM, CCM and Rotor with dry
cloth.
ATTENTION:
Do not use any chemicals to clean the system.
Shield of all the output signal shall be connected to SPM side (refer
to step 4.c of APPENDIX F) and let floating on data acquisition
side.
Third pin of power supply adapter must and shall be connected to
earth.
CCM shall be left floating.
TMS 9250 Product User Manual
Action
Action
Action
Rev B
April 2012

Advertisement

Table of Contents
loading

Table of Contents