Power Connection Cable Routing And Conduit Placement 15/25/30 Kva - Toshiba 4200FA Installation And Operation Manual

Three-phase 15/25/30/50 kva ups
Hide thumbs Also See for 4200FA:
Table of Contents

Advertisement

4.1.4

Power Connection Cable Routing and Conduit Placement 15/25/30 kVA

The following illustrates the proper cable routing that should be followed during the power
connection process of the 15/25/30 kVA.
CONDUIT MOUNTING PANEL
Note:
1) Input and Output conductors shall be installed in separate conduits, and installed in
accordance with the latest edition of NEC and the Local Authority having jurisdiction.
2) Battery conductors shall be installed in a separate conduit and be of low resistance type.
22
INPUT CONDUIT
OUTPUT CONDUIT
BATTERY CONDUIT
4200FA Installation and Operation Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4200fa ct

Table of Contents