Download Print this page

Oneida Air Systems Dust Deputy AXD001004 Owner's Manual page 8

D.i.y. / deluxe kit / ultimate kit / super kit
Hide thumbs Also See for Dust Deputy AXD001004:

Advertisement

V. Assembly Instructions for Deluxe Dust Deputy® Kit
This is just one example of attaching the Deluxe Dust
Example 1
Deputy® to a shop vacuum. Most shop vacuums will
use similar steps but you may have to modify slightly
for your particular vacuum.
1.) Position drum so that lead caster
hole is drilled in bottom of bucket on
logo side as shown in Fig. 1. This is
so safety instructions are not cov-
ered up by foam block and are easily
read. Holes must be at least 1"
from bucket bottom rim so caster
can freely swivel (Fig. 2)when unit
is wheeled around. Use a 5/16" drill
bit for holes. Drill the holes in a tri-
angular pattern as shown in diagram
below and Fig. 3.
For
Clearance
2.) Put casters through bot-
tom of bucket and fasten with
the provided washers and
1/2" hex head nuts as shown
in Fig. 4.
Shop
Vac
3.) Wheel the bucket up to your shop
vacuum and see where the best
placement for foam block will be on
your vac. Mark where block will attach
on your vacuum and bucket as shown
in Fig. 5. You should attach bucket
to the side of vacuum opposite the
vac inlet. See Example 1.
Caster holes must be a minimum
1" from bucket bottom edge so
caster doesn't hit rim of bucket
when wheeled around.
7
Fig.1
Fig. 2
Fig. 3
Caution
Label
OAS
Label
Caution
Label
1"
Fig. 4
Nut &
Washers
Inside of Drum
Fig. 5
Dust Deputy® Owner's Manual © 2010
IX. Adding Cyclones to Improve Performance
Top View
This arrangement may be useful
for very fi ne dust situations.
Attach in Series
Increases particle effi ciency.
Top View
Your arrangement is
only limited by your
imagination!
Attach in Parallel
Same particle effi ciency but
increases CFM.
Top View
Multiple Vacuums
More Airfl ow to Big Tools.
More CFM.
Dust Deputy® Owner's Manual © 2010
200 CFM
100 CFM
100 CFM
- Table Saw
- Jointer
- Planer
2 or More
16

Advertisement

loading