Powering-Up The Switch; Checking The Installation; Power On Self-Test (Post) - 3Com 9100 User Manual

Table of Contents

Advertisement

30
C
2: I
HAPTER
NSTALLATION AND
Powering-up the
Switch
Checking the
Installation
Power On Self-Test
(POST)
S
ETUP
Figure 6
shows the pin-outs for a 9-pin to 9-pin PC-AT serial null modem
cable.
Switch 9100
Cable connector: 9-pin female
Screen
Shell
DTR
4
TxD
3
2
RxD
CTS
8
Ground
5
DSR
6
RTS
7
DCD
1
Figure 6 PC-AT serial cable pin-outs
The Switch 9100 contains two power supplies. When both are
connected, the power supplies operate in a load-sharing configuration. If
one power supply fails, the other power supply takes over, ensuring
uninterrupted network operation. Either one, or both power supplies may
be connected to power the switch. It is recommended that you connect
both power supplies.
To power-up the switch, follow these steps:
1 Connect one or both power cables to the switch.
2 Connect the power cable(s) to the wall outlet(s).
The switch automatically powers-up once it has been connected to the
wall outlet.
After turning on power to the Switch 9100, the device performs a Power
On Self-Test (POST).
During the POST, all ports are temporarily disabled, the packet LED is off,
the power LED is on, and the MGMT LED flashes green. The MGMT LED
flashes until the switch has successfully passed the POST.
PC-AT Serial Port
Cable connector: 9-pin female
Shell
Screen
1
DCD
2
RxD
3
TxD
4
DTR
5
Ground
6
DSR
7
RTS
8
CTS
91_ser2