Booting The Switch; Checking Before Powering On The Switch; Powering On The Switch - 3Com 4210G Series Getting Started Manual

Hide thumbs Also See for 4210G Series:
Table of Contents

Advertisement

Step5 Click Properties in the HyperTerminal window to enter the Switch Properties dialog box. Click the
Settings tab, set the emulation to VT100, and then click OK.
Figure 4-7 Set terminal emulation in Switch Properties dialog box

Booting the Switch

Checking before Powering on the Switch

Before powering on the switch, verify that:
The power cord and ground cable are properly connected.
The power supply voltage is consistent with that required by the switch.
The console cable is properly connected; the terminal (which can be a PC) used for configuration
has been started; and the configuration parameters have been set.

Powering on the Switch

All the Switch 4210G have the same Boot ROM display style. This document uses the Boot ROM
display of Switch 4210G 24-Port as an example:
Starting......
*************************************************************************
*
*
*
*************************************************************************
Copyright (c) 2004-2009 3Com Corporation and its licensors.
Switch 4210G 24-Port BOOTROM, Version 510
4-5
*
*
*

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents