Booting The Switch; Checking Before Power; Powering On The Switch - 3Com Baseline Switch 2900 Series Getting Started Manual

Table of Contents

Advertisement

Step5 Click Properties in the HyperTerminal window to enter the Switch Properties dialog box. Click the
Settings tab, set the emulation to VT100, and then click OK.
Figure 4-7 Set terminal emulation in Switch Properties dialog box

Booting the Switch

Checking Before Power-On
Before powering on the switch, verify that:
The power cable is properly connected.
The power supply voltage meets the requirement of the switch.
The console cable is properly connected; the terminal or PC used for configuration has been
started; and the configuration parameters have been set.

Powering On the Switch

The 3Com Baseline Switch 2900 Family have the same Boot ROM display style. This document uses
the Boot ROM output information on the 3Com Baseline Switch 2928-SFP Plus as an example:
Starting......
************************************************************************
*
*
*
************************************************************************
Creation Date
CPU Type
CPU L1 Cache
3COM 2928-SFP Plus BOOTROM, Version 102
: Jan
8 2009
: ARM926
: 32KB
4-5
*
*
*

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents