Fujitsu SPARC ENTERPRISE M9000 Service Manual page 404

Fujitsu server user manual
Hide thumbs Also See for SPARC ENTERPRISE M9000:
Table of Contents

Advertisement

14. Start (turn on power) all domains together. Take either of the following two
actions:
The power to all the domains is turned on, and then the power-on self test (POST)
is executed. When ok prompt displayed on the console of relevant domain, POST
is completed.
For details of the power-on operation, see
on page
Servers XSCF User's Guide.
15. Restore the original mode switch setting on the operator panel.
20-22
SPARC Enterprise M8000/M9000 Servers Service Manual • June 2010
Press and hold down (for less than four seconds) the POWER switch on the
operator panel.
From a console that is connected to XSCF, execute the poweron -a command
of XSCF.
4-19, and the SPARC Enterprise M3000/M4000/M5000/M8000/M9000
Section 4.4.2, "Powering the Server On"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise m8000

Table of Contents