Inserting The Ufm; Starting The Task - Fujitsu PRIMERGY RX900 S1 Maintenance Manual

Fujitsu server user manual
Table of Contents

Advertisement

14.2.2 Starting the task

Ê Perform the following procedures:
1.
"Opening the rack door" on page 40
2.
"Shutting down the server" on page 41
3.
"Sliding the server out of the rack" on page 42
4.
"Removing the rear cover" on page 46
5. If required to access the installation place: Remove the expansion cards,
see
"Expansion cards and BBU" on page 105
I
Before removing the expansion cards, take a note on the
installation slot number for each card. Make sure that you reinstall
the card in the slot it was located before the replacement.

14.2.3 Inserting the UFM

Figure 164: Preparing the UFM board
Server-specific installation rules are:
Only the nylon screw (1) and the UFM board (2) are used from the available
UFM installation kit, see
The metal spacer is already installed in the baseboard.
RX900 S1
figure
164.
Maintenance Manual
Baseboard
265

Advertisement

Table of Contents
loading

Table of Contents