Completing The Task - Fujitsu PRIMERGY RX900 S1 Maintenance Manual

Fujitsu server user manual
Table of Contents

Advertisement

Figure 141: Connecting the control panel cable
Ê Connect the control panel cable to the baseboard (1).
Ê Close the cable clamp (2).

12.1.7 Completing the task

Ê Perform the following procedures to complete the task:
1.
"Inserting the CPUMEMR in the slot" on page 186
2.
"Closing the server" on page 47
3.
"Mounting the server in the rack" on page 49
4.
"Bringing the server back to operation" on page 51
5.
"Closing the rack door" on page 51
RX900 S1
Front panel and external connectors
Maintenance Manual
233

Advertisement

Table of Contents
loading

Table of Contents