Chapter 2: Installation - Allied Telesis AT-9000/24 Installation Manual

Layer 2 gigabit ethernet switch
Hide thumbs Also See for AT-9000/24:
Table of Contents

Advertisement

Chapter 2
Installation
This chapter contains the following sections:
"Reviewing Safety Precautions" on page 30
"Selecting a Site for the Switch" on page 32
"Cabling" on page 33
"Unpacking the Switch" on page 34
"Installing the Switch on a Desktop" on page 35
"Installing a Switch in a Rack" on page 36
"Cabling and Powering On the Switch" on page 41
"Starting a Management Session" on page 44
"Warranty Registration" on page 48
29

Advertisement

Table of Contents
loading

Table of Contents